Building and chimney inventory
Chimney cards by site, block and unit; type, fuel and past inspections.
For chimney inspection organizations: building and chimney inventory, QR identification, offline measurements, parametric technical drawings, KESA Aladin and e-signed reports.
Chimney inspection software manages building and chimney inventory, inspection plan, team assignment, field measurement, technical drawing, report, signature, verification and the next inspection date together through the chimney identity.
In Vizyon Baca, every chimney is linked to a building, block or unit record and identified with a QR. Field staff open the relevant form from the QR; draught, gas analysis, leak-tightness and photo records can be entered offline as well. Approved measurements are linked to the report with KESA and parametric drawing data; revisions are stored in the main chimney history.
Official sources:
ISO — ISO/IEC 17020 requirements for inspection bodies TÜRKAK — ISO/IEC 17020 transition policy TÜRKAK — Inspection Accreditation Department
For chimney inspection bodies, field teams, technical managers, planning units and teams providing building management services.
Building, chimney identity, inspection plan, work order, measurement, photo, technical drawing, KESA data, report, signature and revision records.
The correct record and form are opened from the chimney QR; measurements, notes and photos are recorded even without internet.
Measurements, technical drawing and additional documents are combined in the same report; the signed current version is published with QR verification and the revision record.
Manage chimney inspections from inventory and QR identification through measurements, KESA calculations and technical drawings to e-signed reports.
Building and chimney inventory is opened; a QR identity is assigned to each chimney.
Periodic inspection calendar, team and vehicle route are planned.
The QR is scanned; draught, gas analysis and leak-tightness are recorded offline.
The report is generated from measurement records and the technical drawing; signed with V-İmza and verified via QR.
The building management sees the report from the panel; the next inspection is set automatically.
As chimney diameter, effective height, elbows, wall type, cap and route fields change, the isometric and plan views update; the output is attached to the report as DXF, PDF or DWG.
Low temperature, positive pressure, condensation-resistant material and sealed-connection parameters.
Natural draught, effective height, elbow count, cap type and route bends.
Flue gas flow rate, diameter, boiler connection, elbows and inspection cap position.
When the calculation is completed in KESA Aladin, the “Send to Server” command is given. Vizyon Baca takes the .alp and PDF files into the same project record; it transfers the technical data inside KESA into the system without re-entry.
After the KESA calculation is completed, the .alp file and the PDF output are attached together to the same project record.
Appliance, chimney, connection parts, diameter, material and wall information are transferred to system fields without being re-entered.
The project calculation, field, inspection and leak-tightness reports are prepared from a single set of data; the permitted leakage amount is calculated automatically.
The KESA-linked project and report flow is accessed in the field by phone or tablet; the team checks the data on site.
You can explore the product's core functions and everyday use cases below.
Chimney cards by site, block and unit; type, fuel and past inspections.
Draught, CO/O₂ gas analysis and leak-tightness values are compared against limits.
With .alp and PDF files, appliance, chimney, connection part and wall information is transferred to the relevant project; report fields are auto-filled.
The chimney route and measurement points are added to the report together with the drawing.
Your existing inspection report format is carried into the system with e-signature and QR verification.
Annual inspections are tracked; reminders are sent to building management and the team.
Site management reaches reports and compliance statuses from its own panel.
The common fields of the project calculation, field, inspection and leak-tightness reports are fed from a single record.
Selected reports and project documents become a single PDF with document number and QR.
Linked reports are revised in sync; R01, R02 versions are archived.
The previous inspection data of the same building is carried into the new report in a controlled manner.
Per-person daily limits, overdue jobs and team load are tracked on the board.
Customer- and province-based prices are reflected in quotations; statements, limits and collections appear on the account card.
Examine how chimney inventory, field measurement, reporting and emission measurement records are managed digitally.
Examine the flow from building and chimney inventory to field measurement, from the technical report to the signed archive.
Evaluate planning, device and personnel records, field evidence and notification steps together.
Answers about offline field records, QR identification, KESA data transfer and report revisions.
No. The software manages measurement, form, drawing, approval and report records. The technical evaluation and conformity decision are the responsibility of authorized inspection personnel and the organization.
Yes. In the form opened from the relevant chimney QR, measurements, notes and photos are recorded offline; when connectivity returns they sync to the chimney and work order record.
After the KESA calculation is completed, “Send to Server” is selected. The .alp and PDF are taken into the same project; appliance, chimney, connection parts, diameter, material and wall information is carried into the project calculation, field, inspection and leak-tightness reports. The permitted leakage amount is calculated by the system.
No. Revisions such as R01, R02 are kept linked to the main report and the chimney record; while the current version is shown on the verification screen, old versions are preserved in the authorized archive.
The modules connect on the same customer, personnel, project, document, authorization and activity records.
Let's plan a 30-minute demo with your own scope, record structure and report formats.